Areas and finishes change between revisions
Track measured areas by zone, level, finish and drawing revision.
Connect area takeoffs, finish schedules, waste factors, substrate preparation, material orders, installation progress, variations and claims in one commercial workflow.

Flooring margin is shaped by more than square metres. Patterns, waste, joins, floor preparation, access, sequencing, adhesives, trims and damaged substrates can turn a well-priced job into a difficult one. SubbieTRAC keeps those assumptions visible from estimate to final claim.
Track measured areas by zone, level, finish and drawing revision.
Record preparation allowances and convert site discoveries into commercial actions.
Connect quantities, waste factors, lead times, batches, supplier pricing and purchase commitments.
Capture instructions, photos, dayworks and costs while the evidence is current.
SubbieTRAC keeps the original estimate, project delivery record and commercial actions connected so your team can act before risk turns into unrecovered cost.
Take off floors, skirtings, stairs, trims and preparation by area, finish and revision.
Build labour, materials, adhesives, waste, floor preparation, access and programme impacts into the estimate.
Carry approved finishes, quantities, supplier quotes, lead times and order requirements into delivery.
Monitor areas released, prepared, installed, protected, inspected and ready to claim.
Record moisture, levelling, damaged substrates, access changes, design revisions and additional preparation.
Compare installed quantities, labour, material use, approved changes, claims and remaining exposure.
The system follows the work instead of forcing your team to rebuild the same information in spreadsheets, folders and manual registers.

Bring tender allowances, project progress, variation exposure, claims and forecast margin into one conversation.
SubbieTRAC turns trade knowledge into repeatable checks, responsibilities and next actions across estimating, delivery and contract administration.
Give each role the information it needs while preserving one reliable commercial history from tender to final claim.
Instead of managing tender allowances, site records, correspondence, variations and claims in separate places, SubbieTRAC keeps them connected to the same project.
See how a connected tender-to-final-claim workflow can help your team reduce missed scope, control change and protect project margin.